Skip to content
Maitland Concrete Works
  1. Home
  2. Cost guide

Concreting cost per m² in Maitland and the Hunter

The per square metre rate for every service on this site, supplied and laid, worked at the sizes people actually pour. Plan from these, then let the site visit turn them into a written figure.

WorkGuide rate per m²Worked example
Driveway, plain broom finish$95 to $13040 m²: $3,800 to $5,200
Driveway, coloured concrete$115 to $16040 m²: $4,600 to $6,400
Driveway, exposed aggregate$130 to $18540 m²: $5,200 to $7,400
Shed and garage slabs$110 to $15036 m²: $3,960 to $5,400
Concrete paths and footpaths$90 to $13016 m²: $1,440 to $2,080
Patios and alfresco slabs$100 to $18024 m²: $2,400 to $4,320
Exposed aggregate concreting$130 to $18516 m²: $2,080 to $2,960
Concrete removal and replacementadd about $3540 m² driveway out first: about $1,400 on top of the new pour

Rates on this site are guide figures for planning a budget. Your price is the written quote after the concreter has seen the block, and it can sit outside the guide where ground, access or a small area call for it.

Six things that shift the number

  • How big the pour is. A 14 m² path on its own carries the same truck, crew and day as a driveway three times the size, so it sits at the top of its rate. Two jobs on one day share the fixed cost.
  • What it stands on. Floodplain alluvium in Maitland, Morpeth and Raymond Terrace wants a compacted base; a slope in Bolwarra Heights or Gillieston Heights wants benching or a retaining edge; Medowie sand wants an edge that is held in. Driveways on Hunter clay explains the first case.
  • Whether the truck gets there. A chute is free. A pump or a barrow run is a line on the quote.
  • The surface. Grey is cheapest, coloured is next, exposed aggregate is dearest, and within exposed the stone decides how much dearer.
  • The kerb strip. Each council fixes what the crossing is built of, 125 mm in 32 MPa in Maitland City and 125 mm in N32 in Cessnock City, and charges its own application fee. The Section 138 guide has all three.
  • What has to come out. Breaking out and carting an old slab adds about $35 per m² before the new one goes down.

When two quotes disagree

A gap of a third between two quotes for one driveway usually means the two concreters are describing two different slabs. The way to find out is to ask both for the thickness, the mesh, the concrete strength, what happens under the slab, where the joints go and what the kerb strip is built to, then set the answers beside the specification. A shed slab is priced the same way, and the shed slab cost guide works the sizes shed suppliers sell. A patio booked for the same pour day as the driveway is the cheapest way to get both.

Calculator

Price your own job

42 m²

Rates on this site are guide figures for planning a budget. Your price is the written quote after the concreter has seen the block, and it can sit outside the guide where ground, access or a small area call for it.

Get this range quoted

Questions

Cost questions

What does concreting cost per m² around Maitland?

Between $90 per m² for a plain path and $185 per m² for exposed aggregate in a premium stone, supplied and laid. Plain grey driveways mostly land between $95 and $130, coloured between $115 and $160, shed slabs between $110 and $150 and patios between $100 and $180. Rates on this site are guide figures for planning a budget. Your price is the written quote after the concreter has seen the block, and it can sit outside the guide where ground, access or a small area call for it.

Why not one price?

Because the same 40 m² driveway costs more on a Bolwarra Heights slope than on a flat Rutherford block, more in charcoal exposed aggregate than in grey, more where a pump has to replace the chute, and more again where a failed slab comes out first. The range holds all of that; the site visit narrows it to one figure.

Are council fees included in the rates?

No. Each council charges its own fee with the driveway application: Maitland City Council publishes $435, Cessnock City Council lists an application fee, an assessment fee and an inspections fee in its schedule, and Port Stephens Council publishes $320. They are paid to council, not to the concreter, and the Section 138 guide lists them.

Is a concrete pump extra?

Where the truck cannot reach the pour by chute, a pump or a barrow run is needed and it is priced in the written quote after the site visit. Mention the side access when you enquire so the first conversation is accurate. Most Thornton and Rutherford yards take a mini excavator through the side gate; some older Maitland lanes do not.

Next step

Narrow the range to one figure

Maitland Concrete Works is a referral service. Each enquiry goes to one independent concreter working the Maitland, Cessnock and Port Stephens council areas, who visits the block, measures, quotes in writing and does the work.

Get it measured and quoted

Tell us what is being poured and the suburb. An independent local concreter rings you back to book the site visit.

Or ring (02) 4012 6377

Call (02) 4012 6377 Get a quote